Case Studies

Skretting Fish Food Factory

Back to News

Large addition to Skretting Factory, Cambridge.

Special features of service delivery

The size and number of storeys of the building required it to have type A fire resistance. Given the number of occupants likely to access the upper levels, an alternative solution was prepared by a fire engineer to reduce the type of construction to type C.

Do you have a challenge for us?